Lab | Chaos in Stasis
Home | Log Archive | Equipment & Costs | Quakelog
Log Archive
Log #2 (16/05/2026) (土)
- 0013: Index page and equipment list added to website. Need a way to efficiently update the website as it grows.
- 0027: Added Required Maintenance subsection to index.
- 0030: Being able to text log updates would be nice. Present protocol utilises Discord + timestamps and is required to be manually transferred.
- 0331: Neurological research into phone addiction proposed. Also, a world globe has been added to the required equipment list.
- 0919: Cheap student microscope bought for $17.89; pending delivery.
- 1642: It was decided to create the lab.chaosinstasis.net subdomain to house the new website.
- 1712: Added costs section to Equipment List.
- 1802: Phone addiction rebound may be a promising direction to take research.
- 2017: Planned to add a section about the 2026-27 El Niño event and repercussions.
- 2038: Created lab.chaosinstasis.net subdomain and uploaded website files to this location.
- 2138: Added and uploaded Quakelog to the website.
Log #1 (15/05/2026) (金)
- 1857: Shortlisted necessary equipment (ink ribbons, CRT, divergence metre, microscope, possibly telescope). Ribbons have been ordered, remaining components require funding.
- 2122: Earthquake detected (off Miyagi, int. 5-; mag. 6.3, no tsunami).
- 2316: No revisions to prior earthquake. EEG and siesmograph added to equipment list.
- 2332: It was decided that the Chaos in Stasis website would be repurposed for the current endeavour.